creating more real estate by removing the mud set as well as the tile.
new master shutoff valves for both bathrooms
repaired ceiling of downstairs apartment new bath waste line of copper and brass new bath waste setting the tub access panel to master valves insulated pipes
Rough-in complete. Tub installed. shower body installed. Time to tile
cut with a grinder shower body installed shower body raised shower head 6″ cement added at corners for rigidity and stability